EndoTherm was piloted by The Minto Group in 3 locations over the 2020/21 heating season resulting in a 11.11% reduction in energy costs & CO2 emissions.
Read MoreEndoTherm Hydronic Boiler Additive Case Study saving the Calgary School District 13.2% on energy costs and CO2 emissions.
Read MoreCase Study: BC Interior Health reduced natural gas costs and emissions by 11.99% using EndoTherm.
Read MoreThe performance of EndoTherm was piloted by a Canadian Provincial Government and BGIS on one of their buildings, heated by 2 x 3500 MBH boilers. Historic consumption was provided for the three years prior to EndoTherm installation. This can be...
Read MoreDakelh & Quesnel Community Housing Society (DQCHS) installed EndoTherm in boiler system water at Milestone Manor, a 31 unit family housing apartment building in downtown Quesnel, BC. EndoTherm helps systems heat up quicker and stay warmer longer, thus requiring fewer heating...
Read MoreLarge school district treats boiler systems with EndoTherm to reduce carbon emissions
Read MoreVancouver Airport steps closer to emissions targets with EndoTherm
Read MoreBC University lowers natural gas consumption by adding EndoTherm to their boiler systems
Read MoreBC Housing takes a bite out of their carbon emission targets with EndoTherm® and the Pace Eco Program
Read MorePace Solutions Corp.
142 - 766 Cliveden Place, Delta, BC Canada V3M 6C7
(604) 520-6211 (800) 799-6211 (604) 521-5927
For more ways to get in touch with Pace locally, visit our Contact Us page to find your regional representative.
Contact Us