A case study of EndoTherm was piloted by The Minto Group in 3 residential building locations resulting in 11.11% reduction in energy costs and emissions.
Read MoreEndoTherm Hydronic Boiler Additive Case Study saving the Calgary School District 13.2% on energy costs and CO2 emissions.
Read MoreCase Study: BC Interior Health reduced natural gas costs and emissions by 11.99% using EndoTherm.
Read MoreThe performance of EndoTherm was piloted by a Canadian Provincial Government and BGIS on one of their buildings, heated by 2 x 3500 MBH boilers.
Read MoreDakelh & Quesnel Community Housing Society (DQCHS) installed EndoTherm in boiler system water resulting in lower energy consumption by 12.04%.
Read MoreLarge school district treats boiler systems with EndoTherm to reduce carbon emissions
Read MoreVancouver Airport steps closer to emissions targets with EndoTherm
Read MoreBC University lowers natural gas consumption by adding EndoTherm to their boiler systems
Read MorePace Solutions Corp.
142 - 766 Cliveden Place, Delta, BC Canada V3M 6C7
For more ways to get in touch with Pace locally, visit our Contact Us page to find your regional representative.
Contact Us